4-6
Chapter 4 - Electrical Requirements and Procedures
Contact Closure REPO Switch Connection
Connect the contact closure REPO wiring to the terminal
block as illustrated in figure 4-9 below.
Note: The factory installed jumper remains as shown.
Fig 4-9 Dry Contact Switch
24 Vdc REPO Switch Connection
Connect the 24Vdc REPO wiring to the terminal block as
illustrated in figure 4-10 below.
Note: The factory installed jumper must be removed.
Fig 4-10 24Vdc EPO Switch
24Vdc
Power
Source
Jumper Installed
Electrical Wiring Test
The following test procedure will ensure that the Power Ar-
ray has been correctly hardwired. The qualified electrician
who installed the Power Array should perform this test. A
true RMS voltmeter and a ground ohmmeter are required.
Before this test can be conducted, the main intelligence mod-
ule (MIM) must be installed, and the PowerView display must
be connected to the Power Array. Refer to Chapter 5 for pro-
cedures to install the MIM and the PowerView.
IMPORTANT: Make sure the power modules and the battery
modules ARE NOT installed for this test.
Note: This test is intended to verify the electrical connection to
the Power Array, not to verify its operation or explain its usage.
In this procedure, you will be instructed to ignore PowerView
messages, etc. Refer to Chapters 6 & 7 for detailed information
about the operation of the Power Array.
Electrical WElectrical W
Electrical WElectrical W
Electrical W
iring Tiring T
iring Tiring T
iring T
est/Checklistest/Checklist
est/Checklistest/Checklist
est/Checklist
q 1. Make sure all three switches -- system enable, mainte-
nance bypass, and input circuit breaker -- are in the off
or stand by position.
IMPORTANT: Make sure all load equipment is either
turned off or is unplugged from the Power Array.
q 2. Use a true RMS voltmeter to measure the input AC
utility (mains) voltagte to the terminal connections at
the rear of the frame (bottom level).
Note: If input voltage is less than 156Vrms or greater than
276Vrms, check input wiring for errors. DO NOT PRO-
CEED UNTIL THE INPUT VOLTAGE IS WITHIN THIS
RANGE.
Record the input voltage here: ____________________
q 3. Check for proper ground installation with a ground
ohmmeter. Check for continuity to building ground.
q 4. Switch the input circuit breaker to the on position.
q 5. Switch the system enable switch to the on position.
Note: The Power Array may make a series of clicking sounds
as it runs through an initial self test.