Setup of Power ArraySetup of Power Array
Setup of Power ArraySetup of Power Array
Setup of Power Array
After the input and output wiring has been properly con-
nected and checked by a qualified electrican, the Power Ar-
ray is ready for the installation of the battery and power mod-
ules. After they are installed, the grill covers are replaced onto
the frame, and the PowerView user interface is mounted onto
the frame.
Frame Leveling Procedure
Position the Power Array so there will be adequate airflow
clearance in the front and the rear of the frame. See figure 5-
1. The weight of the Power Array is supported by four 3.8cm
(1.5") leveling feet pads. Four metal plates can be placed under
each of the leveling feet pads to help displace the weight of
the Power Array.
The procedure for leveling the frame is as follows:
1. Hand turn all four leveling feet until the pads make con-
tact with the floor.
2. Use an open-end wrench to extend each of the leveling
feet by turning the hex nut three complete revolutions.
3. Adjust the leveling feet until the frame is level front to
back and side to side.
Fig 5-1 The Power Array Four Leveling Feet
Removing Grill Covers
The grill covers must be removed before the power and bat-
tery modules can be installed.
Note: Handle grill covers with care to prevent scratching them.
1. Grasp one of the covers by the side holds. See figure 5-2.
2. Pull the cover straight forward. The cover unsnaps from
the frame.
3. Remove all grill covers.
4. Place them safely to one side.
Fig 5-2 Removing Grill Covers from Frame
Chapter 5 - System Setup
5-1
Leveling Feet
Positions
Front Clearance
Rear
Clearance
48.3cm
19"
122cm
48"
53.3cm
21"
30.5cm
12"