EasyManua.ls Logo

Apeks DUPLEX 2000PSI - Facility Requirements; 3 When the System Arrives; Receiving the Crates

Default Icon
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Apeks Supercritical: The Duplex Installation Manual
10
Revision Date 04/11/2019
2.4. Facility Requirements
2.4.1. TemperatureThe system is designed to run in a climate-controlled facility, where the
temperature is maintained between 60°F and 80°F.
2.4.2. Ventilation and Dust ControlThe system should be placed in a well-ventilated environment
that is free from excess dust from other manufacturing operations.
2.4.3. FoundationApeks systems are designed to be installed on a concrete (or similarly stable) flat
floor.
2.4.4. Modulation Apeks Duplex systems are designed to be able to be located in different rooms or
area to isolate different portion of the process. This modulation should be stated during the
purchase process or additional costs and delays may occur.
2.4.5. CO
2
Vent Customer is responsible for running rigid tubing from system outlet to a safe vent
location. (NOTE: Vent lines should be rated to the pressure of the system. ⅜" x.035 or
½" x.049 stainless steel tubing recommended. Contact Apeks for part recommendation if
necessary.)
3. When the System Arrives
3.1. Receiving the Crates
3.1.1. Apeks Labeling Look for an Apeks sticker on the outside of each crate to verify it came
directly from Apeks without tampering. See Figure 1. Note: If no sticker is found, open crate to
verify no damage has occurred during shipping.
Figure 1: Shipping Label