PAD INSTALLATION
Pad Location
Driveway
Direction of Opening
12” 24”
24”
5”
Fig. A
Fig. B
Conduit requirements should be considered in the planning stage. If electrical power is required, a
separate conduit should be installed for electrical only. A certified electrician should be consulted for
the proper conduit material (Figure C & D).
Fig. C
AREA FOR CONDUIT
ENTRY
3”
14”
5”
Fig. D
Pad Location

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Apollo 7300ETL and is the answer not in the manual?

Apollo 7300ETL Specifications

General IconGeneral
BrandApollo
Model7300ETL
CategoryGate Opener
LanguageEnglish

Related product manuals