EasyManua.ls Logo

Aqualisa Digital Quartz - Page 5

Aqualisa Digital Quartz
14 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Shower head systems installation instructions Page 5
Prepare two fixing points between 520mm (minimum) and 830mm
(maximum) apart using the fixings provided, if suitable.
10
The top rail end bracket can be adjusted to suit existing screw holes in the finished wall by sliding the
bracket up or down the rail to suit the required position.
!
Pass the rail through the handset holder while keeping the slider
levers depressed.
11
Carefully slide the gel hook onto the rail under the handset holder.
12
Current Water Supply Regulations state that the handset should not be allowed to pass a point 25mm
above the spill over level of the bath or shower tray. If this cannot be achieved, the hose must be passed
through the gel hook which has been designed to be utilised as a hose restraint.
!
Secure the top rail bracket into position using the screws provided,
if suitable.
13
Attach the bottom rail end body onto the rail.
14

Related product manuals