ilux Digital Bath with diverter installation instructions Page 14
Re-instate the electricity supply to the processor and press the ‘Start/Stop’
button on the controller to turn the bath on.
21
Run the bath at maximum temperature
(factory pre set to 45
0
C). If required, maximum
temperature adjustment can be made with a
flat bladed screwdriver using the ‘MAX TEMP
ADJUSTMENT’ control as indicated. When the
temperature has been set to the desired
position, carefully replace the Digital processor
lid and secure the fixing hand tight only.
22
Site conditions can affect temperature settings, installer to adjust as required.
ALL COPPER PIPE WORK MUST BE CROSS-BONDED AND CONNECTED TO A
RELIABLE EARTHING POINT.
!
Please refer to the separate ilux range user guide for full product operating
instructions.
!