It’s better to install the cable housing
before installing the bottom bracket,
crank and fork.
Rear derailler: Pass the cable housing
inside the frame starting at the rear
derailler hanger until it comes out the
top tube.
Front derailler: Remove the cable guide
(9) under the bottom bracket. Pass the
cable housing inside the downtube
until it comes out the top tube.
Add a plastic cap at the end of the
housing, pass the rear derailler cable
inside the housing and x the cable
guide under the bottom bracket with
the 5mm screw (1.5 Nm).
For a Di2 conguration, use the bottom
bracket dedecated cover (10) for
electric shifting.
10
NITROGEN : 3. Cable housing installation (continued)
9
10