Installation without extension
Installation with extension
slope 5 mm per metre
Level
Level
slope
Fig. 3
Fitting the Coaxial Flue
(Ø 60 / 100 Horizontal)
Contents:
1x Silicone O-Ring (60mm)
1x Elbow (90°)
2x Wall Seals (Internal & External)
1x Flue Pipe including Terminal (1 metre - 60/100)
2x Flue Clamps
4x Screws
2x Seals
Once the boiler has been positioned on the wall, t
the rubber ue seal into the internal ue turret (see
diagram opposite),
insert the elbow into the socket and rotate to the
required position. Note: It is possible to rotate the
elbow 360° on its vertical axis.
Using the ue clamp, seals and screws supplied (Fig
4) secure the elbow to the boiler.
The 1 metre horizontal ue kit (3318073) supplied is
suitable for an exact X dimension of 753mm.
Measure the distance from the face of the external
wall to the face of the ue elbow (X - Fig 2), this
gure must now be subtracted from 753mm, you
now have the total amount to be cut from the plain
end of the ue.
Draw a circle around the outer ue and cut the ue
to the required length taking care not to cut the
inner ue, next cut the inner ue ensuring that the
length between the inner and outer ue is maintai-
ned. (Fig 4).
e.g.
X = 555mm
753-555 = 198mm (Length to be cut from the
plain end of the ue).
Once cut to the required length, ensure that the ue
is free from burrs and reassemble the ue. If tting
the ue from inside of the building attach the grey
outer wall seal to the ue terminal and push the
ue through the hole, once the wall seal has passed
through the hole, pull the ue back until the seal
is ush with the wall. Alternatively, the ue can be
installed from outside of the building, the grey outer
seal being tted last.
Should the ue require extending, the ue connec-
tions are push t, however, one ue bracket should
be used to secure each metre of ue.
Note: See table for maximum and minimum ue
runs.
In the event that extension pieces need to be
shortened, they must only be cut at the male end
and it must be ensured that the inner and outer ue
remain ush.