8
2 INSTALLATION
2.1 General
2.1.1 Make sure assembly and installation work is carried out
7RDYRLGWKHULVNRIEDFNLQMXU\WKLVHTXLSPHQW
should be assembled and installed by at least
two people.
• E\TXDOL¿HGSHUVRQQHO
• in accordance with current local regulations and rules.
• for indoor installation only.
• not to be installed in wet locations.
2.1.2 Installation order
Carry out the installation in the following order:
1. Unpacking
2. Positioning
3. Connecting water
4. Connecting electric power
5. Installation inspection