EasyManua.ls Logo

Armfield FT74P - Installation Requirements

Default Icon
65 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION REQUIREMENTS
The FT 74 UHT Processing unit is of hygienic design and is intended for use in a food
processing laboratory. The "mobile" feature offers a major advantage in that the unit
can be stored away when not in use but then can be easily moved to a convenient site
for operation.
A permanent mains electricity supply with a good earth is also required. This should
be protected by a Residual Current Device. Details of the voltage and current
requirements are given in the section Connection to Services on page 29.
The unit should be positioned close to a supply of potable water and a drain as a
continuous supply of cold water is required for cooling.
Chemicals such as caustic soda solution or phosphoric acid are required for the
cleaning cycle. Suitable storage facilities should be accessible.
Overall dimensions of the FT74 are:-
Height (FT74P) : 1.39 m
Height (FT74T) : 1.38 m
Width : 0.78 m
Depth : 0.79 m
23

Related product manuals