Owner's Manual & Assembly Instructions
T01
Exterior Dimensions Interior Dimensions Door
*Approx. Base (Roof Edge to Roof Edge) (Wall to Wall) Opening
Size Size Width Depth Height Width Depth Height Width Height
8' x 6' 97 1/2" x 68 3/4" 99 3/4" 71 1/4" 74 7/8" 94 3/4" 66" 73 5/8" 43 1/2" 65"
Missing Parts, Questions on Assembly?
Call: 1-800-851-1085
Do not return to dealer, they are not
equipped to handle your requests.
Storage Area: 43 Sq. Ft. 255 Cu. Ft.
4,0 m
2
7,2 m
3
BUILDING DIMENSIONS * Size rounded off to the nearest foot
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
709450510
2,4 m x 1,7 m 247,7 cm x 174,6 cm 253,4 cm 181,0 cm 190,2 cm 240,7 cm 167,6 cm 187,0 cm 110,5 cm 165,1 cm
Model No. HM8667 NP8667 RM86-A
RMG86 RMW86 VH86-A
WL8667
Question and Answer IconNeed help?

Do you have a question about the Arrow HM8667 and is the answer not in the manual?

Summary

BEFORE YOU BEGIN....

Owners Manual

Guidance on understanding the manual for successful construction.

Assembly Instructions

Detailed steps for assembling the specific building model.

Flooring and Anchoring

Importance of a level base and anchoring for building stability.

Parts and Parts List

Instructions for verifying all necessary parts are present.

PLAN AHEAD....

Watch the Weather

Advises selecting dry and calm weather conditions for assembly.

Teamwork

Recommends having two or more people for efficient building assembly.

Tools and Materials

Lists basic tools and materials required for building construction.

Selecting and Preparing Your Site

Guidance on choosing a level site with good drainage for placement.

SAFETY FIRST....

General Safety Precautions

Covers handling sharp edges, tool safety, child/pet exclusion, and wind assembly risks.

CARE & MAINTENANCE....

Finish Care

Instructions for cleaning, waxing, and touching up the building's exterior finish.

Roof Care

Advice on clearing snow and leaves from the roof to prevent damage.

Door Care

Tips for maintaining door tracks and ensuring smooth sliding operation.

Fastener Maintenance

Guidance on using washers and periodically checking fasteners.

Moisture Control

Recommendations for reducing condensation using a vapor barrier.

Other Maintenance Tips

Includes washing part numbers and using silicone for seals.

ACCESSORIES....

Roof Strengthening Kits

Optional kits to increase roof protection against heavy snow accumulation.

Anchor Kits

Various options for securely anchoring the building to the ground.

Tool Hanging Rack

Accessory for organizing tools, fitting inside storage buildings.

Floor Frame Kits

Optional kits providing a base system for the building's foundation.

Attic Kit; Workbench Kit

Adds usable overhead space for storage or as a workbench.

Shelf Units

Shelving accessories to help organize storage space within the building.

Base

OPTION 1: ARROW FLOOR FRAME KIT

Details on using a pre-fabricated floor frame kit as a base.

OPTION 2: Wood Platform

Instructions and materials for constructing a custom wood base.

OPTION 3: Concrete Slab

Guidance for preparing the site and pouring a concrete slab base.

Anchoring

Anchoring into Wood;Post

Method for securing the building to wooden posts or structures.

Anchoring into Concrete

Method for securing the building to a concrete slab or footing.

Step 1

Floor Frame Assemblies

Parts required for assembling the floor frame components.

Step 2

Frame Assemblies

Reinforcing the main frame pieces for the rear wall.

Step 3

Roof Beam Assembly

Joining gables and supporting roof panels with beams.

Step 4

Door Track Assembly

Constructing the door track assembly for sliding doors.

Step 5

Floor Frame

Assembling the four corners of the floor frame and ensuring squareness.

Step 6

Corners

Positioning and attaching rear and front corner panels to the floor frame.

Step 7

Frames

Fastening wall angles and channels to the rear and side walls.

Step 8

Wall Panels

Attaching the main wall panels to the building's frame.

Step 9

Door Jamb

Reinforcing the door opening with jambs for structural integrity.

Step 10

Gable Assemblies

Attaching roof beam brackets to the gable end structures.

Step 11

Gables;Braces

Fastening gables and braces to wall angles and door track supports.

Step 12

Roof Beams

Installing the main roof beam and additional roof beams.

Step 13

Right Roof Panel

Instructions for positioning and fastening the first roof panel.

Step 14

Roof Assembly

Installing remaining roof panels and weather stripping along the ridge.

Step 15

Ridge Cap

Installing the ridge cap and fastening lower panel ends to side wall angles.

Step 16

Roof Trim

Attaching side roof trim, roof trim caps, and securing panel ribs.

Step 17

Door Assembly

Assembling door components including handles, braces, and guides.

Step 18

Door Installation & Adjustment

Instructions for installing and adjusting the building's doors.

Anchoring and Floor Frame

Anchoring

Final instructions and reminder regarding securing the building.

Floor Frame

Final instructions and reminder regarding the floor frame installation.

Some Facts About Rust

Information on the causes of rust and preventive measures for the building.