EasyManua.ls Logo

Arrow LW1012FB User Manual

Arrow LW1012FB
39 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Model No. LW1012FB
Owner's Manual & Assembly Instructions
SR01et
Exterior Dimensions Interior Dimensions Door
*Approx. Base (Roof Edge to Roof Edge) (Wall to Wall) Opening
Size Size Width Depth Height Width Depth Height Width Height
10' x 12' 121" x 143 1/4" 123 1/4" 145 3/4" 81 3/8" 118 1/4" 140 1/2" 80 1/8" 55 1/2" 60"
3,0 m x 3,6 m 307,3 cm x 363,9 cm 313,1 cm 370,2 cm 206,7 cm 300,4 cm 356,9 cm 203,5 cm 141,0 cm 152,4 cm
715800111
Storage Area: 115 Sq. Ft. 686 Cu. Ft.
10,7 m
2
19,4 m
3
BUILDING DIMENSIONS * Size rounded off to the nearest foot
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
Missing Parts, Questions on Assembly?
Call: 1-800-851-1085 or
assist@arrowsheds.com
Do not return to dealer, they are not
equipped to handle your requests.
Question and Answer IconNeed help?

Do you have a question about the Arrow LW1012FB and is the answer not in the manual?

Arrow LW1012FB Specifications

General IconGeneral
BrandArrow
ModelLW1012FB
CategoryOutdoor Storage
LanguageEnglish

Summary

Before You Begin

Flooring and Anchoring Requirements

Understand the need for anchoring and base construction to prevent wind damage.

Parts and Parts List Check

Verify all necessary parts are present by checking against the parts list.

Plan Ahead

Site Selection and Preparation

Choose a level location with good drainage and ample working space.

Safety First

Handling and Tool Safety

Exercise caution with sharp edges and power tools; wear protective gear.

Site Safety for People and Pets

Keep children and pets away from the worksite to prevent distractions and accidents.

Assembly Condition Warnings

Do not assemble with missing parts or on windy days due to potential damage.

Step 1: Floor Frame Assemblies

Step 2: Wall Frame Assembly

Step 3: Roof Beam Assembly

Step 5: Floor Frame Final Assembly

Step 6: Wall Panel Installation

Step 7: Mid Frame Installation

Step 8: Top Frame Installation

Step 9: Remaining Wall Panels

Step 10: Door Jamb Installation

Step 11: Gable Assembly

Step 12: Gable Bracing and Track Support

Step 13: Roof Beam and Brace Installation

Step 14: Right Roof Panel Installation

Step 15: Left Roof Panel and Ridge Cap Installation

Step 16: Second Ridge Cap Installation

Step 17: Third Ridge Cap and Remaining Roof Panels

Step 19: Door Assembly

Step 20: Door Installation and Adjustment

Related product manuals