Check list - Testing before initial
operation
Individual components should be checked in a suitable way.
Description Yes No
Does installed locking element comply with guidelines
for electronic locking systems in escape route doors?
Do controls comply with guidelines for electronic lock-
ing systems in escape route doors?
Does operating device comply with guidelines for elec-
tronic locking systems in escape route doors?
Do you have fitting and installation instructions at
hand?
Do you have the form for escape door locking system
testing before initial operation at hand?
In the case of external power supply to the locking
system or parts thereof:
Does the power supply unit comply with EN 60 950
(does it feature the CE mark)?
The general installation set-up should be checked.
Description Yes No
The locking element does not limit the door headroom
to under 200 cm?
Does the escape door module comply with local build-
ing legislation specifications and guidelines for electri-
cal locking devices for doors on escape routes?
Is the 'EMERGENCY BUTTON' sign present and correctly
affixed?
If the locking unit is installed on fire and/or smoke
doors:
Do the locking element's position and installation type
comply with the door manufacturer's verification of
suitability specifications?
Components
Installation