EasyManua.ls Logo

Astralpool BPM400A User Manual

Astralpool BPM400A
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
17/07/2013
INSTALLATION AND
OPERATING INSTRUCTIONS
Melbourne: 03 8796 8600 Gold Coast: 07 5552 2600 Perth: 08 9350 2600
Sydney: 02 9853 2100 Townsville: 07 4750 3100 sales@astralpool.com.au
Brisbane: 07 3308 5400 Adelaide: 08 8152 7600 www.astralpool.com.au
Bolero ND
Cleaner
INSTALLATION AND OPERATING INSTRUCTIONS I INSTALLATION AND OPERATING INSTRUCTIONS
Astral Heat
Pumps

Questions and Answers:

Astralpool BPM400A Specifications

General IconGeneral
BrandAstralpool
ModelBPM400A
CategoryHeat Pump
LanguageEnglish

Summary

Installation Requirements and Safety

Electrical Safety & Phase Rotation

Mandates use of a multi-pole isolating switch and checks for correct phase rotation on 3-phase units.

Operational Guidelines and Warnings

Water Safety & Health Precautions

Advises on water temperature limits, health risks, and precautions for users.

Chemical Balance and Defrosting

Water Chemistry Maintenance

Emphasizes maintaining water balance to prevent corrosion and voiding warranty, listing recommended parameters.

Thermostat Controls and Settings

Setting Temperature & Clock Adjustment

Guides users on setting the temperature, reading outdoor temperature, and adjusting the real-time clock.

Controller Parameter Configuration

Temperature, Compressor & Defrost Settings

Details parameters related to temperature control, differences, limits, and compressor delay time.

Heat Pump Operating Principles

Temperature Control Modes Explained

Details the three temperature controlling modes: Refrigeration, Heat, and Auto, and their operating logic.

NA6888 Wiring Diagram

Controller Circuit Connections

Illustrates the internal and external wiring connections for the NA6888 thermostat controller.

Heat Pump Installation Procedures

Authorised Installation & Regulations

Stresses that installation must be done by authorized personnel following local and national rules.

Water Connections & Sanitiser Placement

Guides on the correct sequence of water connections and proper placement of sanitising devices to protect warranty.

Installation Clearances & Electrical

Airflow Clearance Requirements

Specifies the minimum clearances required around the heater for proper airflow and ventilation.

Electrical Connection Guidelines

Licensed Electrician & RCD Protection

Mandates that electrical connections must be made by a licensed electrician and protected by an RCD breaker.

Wiring Diagrams & Phase Rotation

Details the need for an isolating switch and checking phase rotation, with diagrams for single and three-phase connections.

Heat Pump Noise Management

Calculating Noise Impact Factors

Introduces a method to calculate noise impact using barrier, reflection, and distance factors.

Heat Pump Noise Distance Example

Step-by-Step Noise Calculation

Demonstrates a step-by-step calculation of the distance factor using example barrier and reflection values.

Determining Minimum Installation Distance

Guides on using a chart to find the minimum required installation distance from noise-sensitive areas based on calculated noise levels.

Further Heat Pump Installation Advice

Electrical Safety Checks & Phase Rotation

Emphasizes ensuring an electrical isolation switch is present and verifying compressor phase rotation for three-phase models.

Troubleshooting Common Issues

Heater Not Starting Troubleshooting

Lists common causes for the heater not starting and provides corresponding remedies for each issue.

Wiring Diagrams - BPM400/BPM600

Wiring Diagrams - BPM700/BPM800

Wiring Diagrams - BPT900

Astral Pool Warranty Details

Warranty Exclusions and Limitations

Related product manuals