Installation & Servicing instructions ATAG iC-Range
78
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
Benchmark Commissioning and
Servicing Section
It is a requirement that the boiler is installed and commissioned to the
manufacturers instructions and the data elds on the commissioning checklist
completed in full.
To instigate the boiler guarantee the boiler needs to be registered with the
manufacturer within one month of the installation.
To maintain the boiler guarantee it is essential that the boiler is serviced annually
by a Gas Safe registered engineer who has been trained on the boiler installed.
The service details should be recorded on the Benchmark Service Interval
Record and left with the householder.
*AllinstallationsinEnglandandWalesmustbenotiedtoLocalAuthorityBuildingControl(LABC)eitherdirectlyorthrougha
CompetentPersonsScheme.ABuildingRegulationsComplianceCerticatewillthenbeissuedtothecustomer.
www.centralheating.co.uk
©HeatingandHotwaterIndustryCouncil(HHIC)
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
FailuretoinstallandcommissionaccordingtothemanufacturersinstructionsandcompletethisBenchmarkCommissioningChecklistwillinvalidatethe
warranty.Thisdoesnotaffectthecustomersstatutoryrights.
GAS BOILER SYSTEM COMMISSIONING CHECKLIST
Customername: Telephonenumber:
Address:
Boilermakeandmodel:
Boilerserialnumber:
Commissionedby(PRINTNAME): GasSaferegisternumber:
Companyname: Telephonenumber:
Companyaddress:
Commissioningdate:
To be completed by the customer on receipt of a Building Regulations Compliance Certicate*
BuildingRegulationsNoticationNumber(ifapplicable):
CONTROLS(ticktheappropriateboxes)
Timeandtemperaturecontroltoheating
Roomthermostatandprogrammer/timer Programmableroomthermostat
Load/weathercompensation Optimum start control
Timeandtemperaturecontroltohotwater Cylinderthermostatandprogrammer/timer CombinationBoiler
Heatingzonevalves Fitted Notrequired
Hotwaterzonevalves Fitted Notrequired
Thermostaticradiatorvalves Fitted Notrequired
Automaticbypasstosystem Fitted Notrequired
Boilerinterlock Provided
ALL SYSTEMS
ThesystemhasbeenushedandcleanedinaccordancewithBS7593andboilermanufacturersinstructions Yes
Whatsystemcleanerwasused?
Whatinhibitorwasused? Quantitylitres
Hasaprimarywatersystemlterbeeninstalled? Yes No
CENTRAL HEATING MODE measureandrecord:
Gasrate m³/hr OR ft³/hr
Burneroperatingpressure(ifapplicable) mbar ORGasinletpressure mbar
Centralheatingowtemperature °C
Centralheatingreturntemperature °C
COMBINATION BOILERS ONLY
Istheinstallationinahardwaterarea(above200ppm)? Yes No
Ifyes,andifrequiredbythemanufacturer,hasawaterscalereducerbeentted? Yes No
Whattypeofscalereducerhasbeentted?
DOMESTIC HOT WATER MODEMeasureandRecord:
Gasrate m³/hr OR ft³/hr
Burneroperatingpressure(atmaximumrate) mbar ORGasinletpressureatmaximumrate mbar
Coldwaterinlettemperature °C
Hotwaterhasbeencheckedatalloutlets Yes Temperature °C
Waterowrate I/min
CONDENSING BOILERS ONLY
Thecondensatedrainhasbeeninstalledinaccordancewiththemanufacturersinstructionsand/orBS5546/BS6798 Yes
ALL INSTALLATIONS
Recordthefollowing:
Atmax.rate:COppm AND CO/CO
²
Ratio
Atmin.rate:(wherepossible)COppm AND CO/CO
²
Ratio
TheheatingandhotwatersystemcomplieswiththeappropriateBuildingRegulations Yes
Theboilerandassociatedproductshavebeeninstalledandcommissionedinaccordancewiththemanufacturersinstructions Yes
Theoperationoftheboilerandsystemcontrolshavebeendemonstratedtoandunderstoodbythecustomer Yes
Themanufacturersliterature,includingBenchmarkChecklistandServiceRecord,hasbeenexplainedandleftwiththecustomer Yes
CommissioningEngineersSignature
CustomersSignature
(Toconrmsatisfactorydemonstrationandreceiptofmanufacturersliterature)
www.centralheating.co.uk

Table of Contents

Other manuals for Atag i28C

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atag i28C and is the answer not in the manual?

Atag i28C Specifications

General IconGeneral
BrandAtag
Modeli28C
CategoryBoiler
LanguageEnglish

Related product manuals