SMART TDS BLOWDOWN CONTROLLER
5.2.16 Software Version
Allows the software version to be viewed.
• Be sure that all phase and neutral ends are connected to the right terminals on BC 900 Smart Automatic Bottom
Blowdown Controller before energyz.
• Be sure that all function values are adjusted correctly.
• Be sure that all wiring made correctly in compliance with "Automatic TDS Blowdown Valve BCV 900 Installation
and Operating Instructions"
• Be sure that all wiring made correctly in compliance with "Conductivity Probe CP 920, CP 930 or CP 950 Installation
and Operating Instructions"
Please make sure to remove the main supply before detach the device.
Warning!
Otherwise this may cause damage to the product, personal injuries or even death.
The device is not subject to repair and / or maintenance other than by authorized
When any fault situation occurs or maintenance is necessary, please contact with “
“Atech Service Department”
It is recommended to perform the function tests regularly.
IM-BC900-18C Page 14