SMART TDS BLOWDOWN CONTROLLER
Wiring for CP 920 Conductivity Probe and TP 900 Temperature Probe at BCS 920 TDS Blowdown Systems
Figure 6 Wiring for CP 920 Conductivity Probe and TP 900 Temperature Probe at BC 900 TDS Blowdown Controller
Blue and Red cables at CP 920 Conductivity Probe, shoud be connectted to the BC 900 TDS Blowdown Controller as
three cables thanks to a junction box as showed at Figure 6. Red cables must be connected to therminals 1 and 2,
Also blue cable must be connected to terminal 3 at BC 900 TDS Blowdownd Controller.
Connect screen to earth (blue wire)
TP 920 Temperature Probe's cables must be connected terminal 4 and 5 at BC 900 TDS Blowdownd Controller.