EasyManua.ls Logo

Atlas Copco QAS 200 VoD S3A ESF - Page 91

Atlas Copco QAS 200 VoD S3A ESF
170 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 91 -
Check fuel injectors (2) x
Check engine protective devices xx
Inspect starter motor xx
Inspect turbocharger xx
Inspect water pump xx
Inspect charging alternator xx
Inspection by Atlas Copco service technician x x x
Generators in stand-by application have to be tested on a regular basis. At least once a
month the engine should run for one hour. If possible a high load (> 30%) should be
applied so that the engine reaches its operating temperature.
Maintenance schedule Daily
50 hrs
after initial
start-up
Every 500
hours
Every 1000
hours
Every 2000
hours
Yearly
Service pak - - 2912 4530 05 2912 4531 06 2912 4532 07 -

Table of Contents

Related product manuals