Monthly:
1. Re-torque the anchor bolts between 60 and 86 foot pounds;
2. Check all connectors, bolts and pins to insure proper mounting;
3. Lubricate cable with lubricant;
4. Make a visual inspection of all hydraulic hoses/lines for possible wear or
leakage;
5. Check Safety device and make sure proper condition;
6. Lubricate all Rollers and Pins with 90wt. Gear oil or equivalent;
Note: All anchor bolts should take full torque. If any of the bolts does
not function for any reason, DO NOT use the lift until the bolt has
been replaced.
Every six months:
1. Make a visual inspection of all moving parts for possible wear, interference or
damage.
2. Check equal tension of the cables and adjust as necessary to insure level
lifting.
3. Check columns are plumb.
4. Check Rubber Pads and replace as necessary.
5. Check safety locks and make sure they are in proper condition.