EasyManua.ls Logo

ATS US-2000 V5 - 1.2. Band Channel Cleaning

ATS US-2000 V5
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
-
2000
(
DCP 2000 V
V
5)
SERVICE MANUAL
C
E
Fertigstellung: 02.16
US
-
2000
gg
Serviceanleitung_US2000V5_EN_V0.0.docx
Page 4 of 23
Maintenance
1. Maintenance
Maintenance work must be performed exclusively by authorised personnel. The machine must always be turned
off and disconnected from the power grid prior to that!
The indicated maintenance interval refers to single shift operation in a normal environment.
1.1. Monthly maintenance
Procedure:
1. Fold down the front planel.
2. Remove product guides
3. Remove rear table
4. Clean machine using compressed air or a vacuum cleaner.
5. Blow out the arch using compressed air.
6. One drop of oil each into the left and the right lead of the Anvil.
7. One drop of oil each into the left and the right lead of the sonotrode.
8. One drop of oil into the guide slot for the knife.
Important: Solvents or alcohol must never be used to clean the plastic arch