Perform the following procedure to install your switch in an equipment rack.
Note:
When mounting two 3510GT-PWR+ units side by side in an equipment rack, run the switches
in high power mode to ensure adequate airflow. In high power mode, the available power is
170 Watts.
#show poe-main-status
PoE Main Status - Stand-alone
-------------------------------------------------
Power Mode : High Power Budget
Available DTE Power : 170 Watts
DTE Power Status : Normal
DTE Power Consumption : 0 Watts
DTE Power Usage Threshold : 80%
PD Detect Type : 802.3af and Legacy
Power Source Present : AC Only
AC Power Status : Present
DC Power Status : Not Present
Procedure
1.
Ensure power is disconnected from the switch.
2. Connect the two ERS 3510GT switches together by opening the hinged bracket to
90° and attaching it to each ERS 3510GT switch with three M4 flat head screws
(included), as shown below.
Installation preparation
8 February 2013