EasyManua.ls Logo

Avaya 4900 Series - Chapter 2: New in this document; 10 GBASE-BX10; SFP and SFP+ transceiver models list; Locating end of sale notices

Avaya 4900 Series
57 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4: Installing Ethernet Routing
Switch 4900 Series
This chapter provides the information and procedures to install the Ethernet Routing Switch 4900
Series.
Installation checklist
Use this checklist to install the Ethernet Routing Switch 4900 Series.
No. Task Description
1. Mount the Ethernet Routing Switch
4900 Series in the equipment rack.
To install the switch, see Installing the
Switch in an equipment rack on page 26.
To install the switch using optional four-post
rack-mount brackets, see Installing optional
four post rack mount brackets on page 30.
3. Check the LEDs to verify the
installation.
See Switch LED state indicators on
page 50
2. (Optional) Install the secondary power
supply.
See Installing the secondary power
supply on page 34
4. (Optional) Connect the switches in a
stack.
See Connecting switches in a stack on
page 46
Ethernet Routing Switch 4900 Series models
This section provides information about the switches in Ethernet Routing Switch 4900 Series.
Ethernet Routing Switch 4900 Series models
The following table lists the different Ethernet Routing Switch 4900 Series models and the key
features for each switch.
February 2016 Installing Avaya Ethernet Routing Switch 4900 Series 12
Comments on this document? infodev@avaya.com

Other manuals for Avaya 4900 Series

Related product manuals