- Appropriate rack space to accommodate 1U switch height is 1.7 inches (44 millimeters).
- Four-post rack bolted to floor and braced if necessary.
- Four post-rack must be grounded to the same grounding electrode used by the power
service in the area. The ground path must be permanent and must not exceed 1 ohm of
resistance from the rack to the grounding electrode.
Figure 8: Four-post rack-mount kit assembly
Procedure
1. Attach a front bracket to each guide bracket with four 8.5 mm length flat head machine
screws.
2. Attach the guide brackets to the switch chassis.
Switch installation