EasyManua.ls Logo

Avaya Virtual Services Platform 7200 Series - Page 53

Avaya Virtual Services Platform 7200 Series
63 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
d. Close the bracket assembly so that it wraps around the frame and locks into place.
e. Repeat the above steps on the rear bracket.
f. Repeat these steps for the rack rail on the other side of the frame.
9. Install the switch in the equipment rack to complete the installation. (See Step 6 of the
300mm-600mm instructions.)
a. Insert the chassis rails on the switch into the rack rails on the frame.
b. Pull the blue locks on the chassis rails towards the front and slide the switch into the
frame.
Note:
After you install the switch in a rack, slide it out until the lock (shown above) engages.
To slide the switch back into the rack, push the blue locks on the chassis rails towards
the back and slide the switch into the frame.
10. Connect power and network connections to the switch.
Installing the switch in an equipment rack
October 2015 Installing the Avaya VSP 7200 Series 53
Comments on this document? infodev@avaya.com

Other manuals for Avaya Virtual Services Platform 7200 Series

Related product manuals