11-3
Chapter 11.  CALIBRATION
For details about how to connect measuring instruments in the apply status, refer to 
the following figures:
•  The PV input type is T/C (thermocouple). 
Voltage
generator
This unit
-
+
(10)
(11)
(12)
•  The PV input type is RTD. 
Resistor
This unit
(10)
(11)
(12)
•  The PV input type is LIN (DC voltage/DC current). 
Voltage
generator
Gain Nos. 1 to 12 (voltage)
This unit
-
+
(10)
(11)
(12)
Current
generator
Gain Nos. 13 to 16 (current)
This unit
-
+
(10)
(11)
(12)
(6)  Keep the apply status for approximately 30 s.
(7)  Click [Write].
(8)  Return to step (3) and repeat the procedure until the final gain No. is 
completed.
 
 Handling Precautions
•  In the PV input calibration, always adjust all gains.
•  Do not leave the PV input terminal open during heat-up between 
power ON of this unit and starting of calibration. When the input type is 
thermocouple or DC voltage, put the unit in the 0 volt input (or terminals 
are short-circuited) status. When the input type is RTD, put the unit in the 
100 -input (or terminals are short-circuited) status.