15
www.bainultra.com
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.
INSTALLATION INSTRUCTIONS | LIBRA COLLECTION
INSTALLATION WITHOUT ACCESS UNDER THE FLOOR
2
BATH INSTALLATION
HELPFUL TIPS:
• Carefully place the tub on
its side, on a blanket or a
corrugated cardboard.
• To easily manipulate
the bathtub in a safe way
during installation,
we recommend using
moving straps.
STEPS TO FOLLOW
• Do not remove the protective plastic lm on the tub
and place a drop-cloth in the tub during installation
to protect the acrylic.
• Be sure the oor is leveled. Use shims as needed.
• Connect the Island Tub Drain
• Apply a bead of silicone at the perimeter
of the bath once on the oor.
Air Intake
Hole for cables
ITD