BDCOM GP3600-08 GPON Hardware Installation Manual
- 18 -
3.4 Checking after Installation
After BDCOM GP3600-08 GPON is installed, please conduct the following checkups
before it is powered.
If the GPON access device is installed on the cabinet, check whether the
installation point between the cabinet and the GPON access device is strong. If
the GPON access device is installed on the desk, check whether there is enough
space for the GPON access device to discharge its heat and whether the desk is
stable.
Check whether the connected power meets the power requirements of the
GPON access device.
Check whether the grounding line of the GPON access device is correctly
connected.
Check whether the GPON access device is correctly connected to other terminal
devices.