EasyManua.ls Logo

Beko BA309C - Installation Instructions; F-Gas Instruction

Beko BA309C
276 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44 / 276 EN
Local ar condtoner / Instructon Manual
10.1 F-Gas nstructon
This equipment contains fluorinated greenhouse gases.
The fluornated greehouse gases are contaned n hermetcally sealed equpment.
Installs, servces, mantans, repars, checks for leaks or decommssons equpment and product
recyclng should be carred out by natural persons that hold relevant certfcates.
If the system has a leakage detecton system nstalled, leakage checks should be performed at least
every 12 months, make sure system operate properly.
If product must be performed leakage checks, t should specfy Inspecton cycle, establsh and save
records of leakage checks.
C
Note: For hermetcally sealed equpment, portable ar condtoner, wndow ar
condtoner and dehumdfer, f CO
2
equvalent of fluornated greenhouse gases s less
than 10 tonnes, t should not perform leakage checks.
10 Installaton nstructons

Table of Contents