EasyManua.ls Logo

Belling FSE 54 DO - Connecting the Electricity Supply

Belling FSE 54 DO
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION INSTRUCTIONS - ELECTRIC
Connect to the electricity supply
Warning:
This appliance must be earthed.
This appliance is not intended to be
operated by means of an external timer
or separate remote control system.
The appliance must be installed by a
competent electrician using a double
pole control unit of 32 ampere minimum
capacity with 3mm minimum contact
separation at all poles.
We recommend that the appliance is
connected by a competent person who
is a member of a competent persons
scheme.
1. Access to the mains terminal
is gained by opening the terminal block
cover at the rear of the appliance (use a

2. Connection should be made with

3. First strip the wires, then push
the cable through the cable clamp in the
terminal block cover.
4. Connect the cable to the
terminal block and tighten the cable
clamp screw (see diagram).
5. Close the terminal box, ensuring
that the cover is engaged on the locking
tabs.

the two terminal blocks below, Block A,
Block B

Other manuals for Belling FSE 54 DO

Related product manuals