INSTALLATION CHECKLIST
3
Determine the proper geometry. Pages 4 & 5.
Install the Post bracket. Page 6 & 7.
Install the Gate Bracket. Page 7.
Install the magnet holder. Page 7
Wire the motors. Page 8.
Attach the actuators to the mounting brackets. Page 8.
Set the limit switches. Page 9.
Connect the motors to the control board. Page 10.
Install and connect your safety devices. Page 11.
Install and connect your operating devices (if applicable). Page 11.
Install and connect your magnetic lock (optional). Page 12.
Program your remotes. Page 13.
Set your controller to Single Motor Operation if needed. Page 13.
Run and time your motors from fully open to fully closed positions.
Set your slowdown settings. Page 14.
Set the torque adjustment. Page 14.
Set additional features as needed. See Programming Menu Reference page (Back cover).
TECH SUPPORT U.S. TOLL FREE: 877-995-8155 / INT'L: +1-561-995-8155