EasyManua.ls Logo

BIRD MARK 7 - Page 17

Default Icon
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
with
a
¥%”
open
end
wrench,
being
careful
not
to
lose
the
small
O-ring
on
the
end
of
the
valve.
3.17
Using
a
thin
bladed
screwdriver,
remove
the
screw
and
nylon
washer
forming
a
plug
on
the
bottom
of
the
Centerbody.
4.0
VENTILATOR
COMPONENT
CLEANING
4.1
The
components
of
the
respirator
may
be
soaked
(with
exception
of
the
manometer,
mag-
nets
and
tubing
assemblies)
in
a
liquid
detergent
for
superficial
cleaning.
After
soaking,
parts
should
be
removed,
rinsed
and
scrubbed,
if
necessary,
to
remove
all
tráces
of
lubricant.
Following
the
completed
assembly,
it
will
be
necessary
to
decontaminate
with
ethylene
oxide
gas
sterilization
to
insure
internal
sterility
of
the
respirator.
4.2
Particular
attention
should
be
paid
to
the
ceramic
switch.
Use
an
abrasive
type
cleaner
sparingly
with
a
toothbrush
and
small
diameter
clean
or
replace
inlet
filter
(P/N
6804)
and
reinstall
inlet
assembly
into
Centerbody
using
78"
open
end
wrench
to
secure
in
place.
5.2
Assemble
rotary
ON/OFF
valve
as
follows:
=
Inspect
O-ring
(P/N
0143)
on
valve
body
wing
nut
assembly
for
flat
spots,
cuts
or
damage.
Replace
if
necessary.
и
Inspect
O-rings
(P/N
0114
and
P/N
0274)
on
valve
piunger
for
flat
spots,
cuts
or
damage.
Replace
if
necessary.
=
Place
a
small
drop
of
lubricant
(P/N
631)
on
O-ring
(P/N
0114)
on
poppet,
prior
to
installation.
ms
Reinstall
components
into
valve
body
per
exploded
view
(Fig.
26)
and
secure
the
spring
retainer
nut
in
place
witha
%e"openend
,
wrench.
>
|
NOTE:
it
may
be
necessary
to
stabilize
the
valve
insert
in
place
with
a
"46"
open
end
wrench
while
tightening
-
brush
(Fig.
25)
to
clean
completely.
The
clear
? 7
the
spring
retainer
nut
in
place.
ance
between
the
spindle
and
bushing
is
nor
maily
0.0001
inch.
These
contacting
surfaces
should
be
thoroughly
cleaned
and
rinsed
in
αἱς-
tilled
water,
if
available,
and
blown
dry
with
clean
compressed
air,
The
shoulders
of
the
spindle
should
not
be
handied
in
any
way
once
cleaned.
B
Temporarily
connect
the
Centerbody
to
a
gas
source
to
determine
at
which
point
the
gas
flow,
through
the
valve,
is
OFF.
Using
a
Ye"
allen
wrench,
reinstall
the rotary
knob
with
19
NOLLJAS
the
OFF
position
vertical
on
the
valve.
53
Place
O-rings
(P/N
5999)
onto
female
quick-
disconnect
studs,
and
with
a
%e"
nut
driver
or
open
end
wrench,
reinstall
into
Centerbody
(Fig.
27).
-
NOTE:
Tapered
socket
(P/N
6835)
is
the
tall
socket
and
(P/N
4059)
is
the
shorter
socket.
FIGURE
25
4.3
Clean,
dry
compressed
air
should
be
used
to
dry
all
channels
in
the
Centerbody
and
all
other
components.
B.
ASSEMBLY
5.0
CENTERBODY
ASSEMBLY
5.1
With
Centerbody
in
a
padded
vise,
install
new
O-ring
(P/N
5608)
into
inlet
port.
Inspect,
FIGURE
26
15
SNONLDMHULSNI
ATANASSYVSH
ONY
ATSINISSYSIĞ

Related product manuals