103
103
104
104
62
63
1
35
64
16
Step 2: Assembly of the Upright Posts
1. Place the treadmill in an upright position.
2. Assemble the left upright post (62) to the corresponding position of the base weldment (1) with
two bolts (103) and two bolts (104).
࣑ ATTENTION
Be careful not to pinch the cables in the following step.
3. Connect the two cables (35 and 64) with one another and repeat the previous steps for the right
upright post (63).
Step 1: Unpacking
1. Lift the equipment out of the box and place it on a at surface.
2. Remove all packaging material from the equipment.