Page 50 Operating instructions for S 40-3...S 150-3 series screw compressors
Commissioning
Proceed as follows during commissioning:
Check the oil level in the oil circuit.
Gradually open the valves on the water side.
Avoid pressure hammers!
Vent the pipelines.
Any residual air contained in the heat exchanger will be carried along by
the media conveyed and will escape through the system.
Maintenance
The safety circuit, including the pressure control device and the expansion
vessel, forms a closed, maintenance-free system.
WARNING!
Do not open the system under any circumstances.
Opening the system will put the operation and safety of the heat exchanger
at risk!
If confining liquid escapes as a result of damage, send the heat exchanger
to BOGE for repair.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Boge SF 100-3 and is the answer not in the manual?

Boge SF 100-3 Specifications

General IconGeneral
BrandBoge
ModelSF 100-3
CategoryAir Compressor
LanguageEnglish

Related product manuals