Page 19 3BE390845NI – 01/12
BONNET GRANDE CUISINE
Registered office:
Rue des Frères Lumière - Z.I Mitry Compans
F-77292 MITRY MORY Cedex
5.2 CHANGING FROM ONE GAS TO ANOTHER
Depending on the country of installation and the category of the appliance (indicated on the data plate),
the change from one gas to another may require 2 operations:
CI
Change jets (main burner, pilot) (See paragraph 5.4)
RA
Adjustment of primary air (See paragraph 5.4)
PROCEDURE:
On the data plate, check:
- The category(ies) of the equipment
- The gas and pressure for which it is adjusted.
In the following table, select:
- the country in question
- the gas and the category of the equipment (see above)
- the gas and pressure for which the equipment is going to be set
- Follow and carry out the necessary operations
- Replace the gas data plate and fill in the box with the new gas used.