EasyManua.ls Logo

Bosch Climate Class 6000i - Commissioning; Commissioning Checklist; Functional Test of Device; Handover to the User

Bosch Climate Class 6000i
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
Climate Class 6000i/8000i – 6721831489 (2021/02)
38
4 Commissioning
4.1 Commissioning checklist
Table 8
4.2 Functional test of device
The system can be tested once the installation including tightness test
has been carried out and the electrical connection has been established:
▶Connect the power supply.
Switch on indoor unit with the remote control.
▶Hold the ON/OFF [1] key pressed for 5 seconds to set the
Cooling mode ( Fig. 21)
A beep sounds and the ON indicator flashes.
Test cooling mode for 5 minutes.
Ensure freedom of movement of air baffle [2].
Select the heating mode on the remote control.
Test heating mode for 5 minutes.
Press the ON/OFF key again to stop the operation.
4.3 Handover to the user
When the system has been set up, hand over the installation manual
to the customer.
Explain to the customer how to use the system, referring to the
operation manual.
Advise the customer to carefully read the operation manual.
1 Outdoor unit and indoor unit are correctly installed.
2 Pipes are correctly
•connected,
thermally insulated,
and checked for tightness.
3 Condensate pipes are functioning correctly and
have been tested.
4 Electrical connection has been correctly
established.
Power supply is in the normal range
Protective conductor is properly attached
Connection cable is securely attached to the
terminal strip
5 All covers are fitted and secured.
6 The horizontal louver of the indoor unit is fitted
correctly and the actuator is engaged.
OBJ_DCL-6721831489-001.fm Page 38 Wednesday, April 21, 2021 2:52 PM

Table of Contents

Other manuals for Bosch Climate Class 6000i

Related product manuals