EasyManua.ls Logo

Bosch CR 10 H - Page 26

Bosch CR 10 H
112 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Information for heating contractor
CR 10 H – 6720876740 (2017/08)
26
A reset restores the default setting. In the event of a power failure, the settings
including the heating circuit allocation are retained.
L.1 1 | 0 Optimised running of the pump: in the case of
flow temperature control, the heating pump
runs as briefly as possible. Switch off, if there
is a buffer cylinder in the system.
C.1 C | F Unit of displayed temperature °C (C) or °F (F)
S.1 nF.12.01 Software version
3)
F.1 1 | 0 Resetting CR 10 H
0: Do not reset
1: Reset
U.2 0 ... 999 Nominal flow rate m
3
/h
U.3 3 ... 6 ... 12 Filter runtime in months
U.4 1 | 0 Bypass installed
1: Yes
0: No
U.5 1 | 2 | 3 Frost protection
1: Interval
2: Disbalance
4)
3: Electric pre-heater bank
4)
U.6 30 ... 60 ... 120 Sleep mode duration in minutes
U.7 10 ... 15 ... 60 Intensive ventilation duration in minutes
1) Highlighted values = Default setting
2) Only one CR 10 H must be allocated to each heating circuit.
3) Turn the selector to read out the whole value.
4) Certified by the German Institute for Building Technology (DIBT)
Setting Adjustment
range
1)
Description

Related product manuals