EasyManua.ls Logo

Bosch SM048 - Panel Reinstallation and Duct Flanges; LCD Wiring Rerouting and Panel Reinstallation; Return and Discharge Duct Flanges; Duct Flange Installation Notes

Bosch SM048
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pre Installation Unit Preparation | 25SM Series Heat Pump
6 720 220 406 (2013/1)SM Series Heat Pump
PRE INSTALLATION UNIT PREPARATION
Corner Cap Installation Instructions
Each corner cap is stamped with one the following
identifiers: T, T1,T2 B, B1, B2, A.
1. Identify Letter code on each Corner Cap.
(Figure#87)
Figure # 87
2. In preparation for installation identify each
Corner Cap location. (VT & CF Figure#88 and
HZ Figure#89)
Figure # 88
Figure # 89
3. Remove adhesive backing and install each
Corner Cap. (Figure#90 and#91)
Figure # 90
Figure # 91
T
B
A
T2
T1
T1
T1
T2
T2
A
A
A
A
Ensure cabinet surface is clean and free of
debris to ensure proper Corner Cap Adhesion.

Table of Contents

Other manuals for Bosch SM048

Related product manuals