4 Installation
4.1 Packaging and product identication
The SSB is delivered strapped to a pallet, packed and protected in a
cardboard carton.
NOTICE: The packaging shows the characteristics of the
product: model, power, fuel type and version. In case of
deviation from the order, contact your local dealer.
After removing the packaging check the condition and
completeness of delivery.
WARNING: Keep the packing material out of reach of
children as it may be dangerous.
Dispose of packaging in an environmentally responsible
manner.
In order to ensure proper product identication do not
remove or tamper with any product identication tags or
labels.
4.2 Site preparation
Ensure that the site selected for installation of the SSB 800 SA,
1000 SA and 1000 TL Boiler includes:
Access to AC Input Power at 120 VAC, Phase-Neutral, 60 Hz @ 15
FLA
Access to Natural Gas line at a recommended pressure of 8 inches
W.C. (or higher) for 798,000 BTU/hr energy input for the SSB 800 SA,
1,024,000 BTU/hr energy input for the 1000 SA and 1000 TL.
4.2.1 Installation clearances
The SSB models 800 SA, 1000 SA and 1000 TL are packaged in an
enclosure having identical size.
The unit must be installed with the prescribed clearances for service
as shown in Fig. 7. The minimum clearance dimensions, required
by BOSCH, are listed below. However, if Local Building Codes
require additional clearances, these codes shall supersede BOSCH’s
requirements. Minimum acceptable clearances required are as follows:
Minimum acceptable clearances required are as follows:
800 SA - 1000 SA - 1000 TL
Recommended
Service Clearances
Required Service
Combustibles
Side 24 12 inches
Front 40 40 inches
Rear 20 2 inches
Top 12 6 inches
All gas piping, water piping and electrical conduit or cable must be
arranged so that they do not interfere with the removal of any panels, or
inhibit service or maintenance of the unit.
WARNING: Keep the unit area clear and free from all
combustible materials and ammable vapors or liquids.
CAUTION: While packaged in the shipping container, the
unit must be moved by pallet jack or forklift from the SIDE
ONLY.
FOR MASSACHUSSETTS ONLY:
For Massachusetts installations: the installation must comply with all
requirements specied.