Installation
Greenstar Danesmoor Utility
ErP+
and Utility System
ErP+
- 6 720 821 720 (2018/04)24
5.2 Pipework positions and flue opening
Safety
All relevant safety precautions must be undertaken.
Protective clothing, footwear, gloves and safety goggles must be worn as
appropriate.
Pipework connections - Regular
A - Flow connections (optional combined feed and vent) 1” BSP
B - Return connections 22mmØ copper on 12/18, 18/25 models and
28mmØ copper on 25/32 models
C - Condensate outlet 21.5mm Ø
D - Flue outlet
E - Oil pipe optional centres
F - Optional oil line return line connection
Fig. 30 Top view of Regular boiler pipe connections
Fig. 31 Front view of Regular boiler pipe connections
CAUTION: Drilling
▶ Ensure there are no pipes, electrical cables, damp
proof courses or other hazards before drilling.
For servicing purposes, keep condensate discharge pipe
away from components and pipework connections.
35
69
48
19
67
48
B
370
6720808218-100.1Wo
A
All dimensions are in millimetres
A
TOP VIEW
69
35
67
A
D
BA
C
21.5
100
412
FRONT VIEW
825
6720808218-101.1Wo
All dimensions are in millimetres
E
F
321
40