EasyManua.ls Logo

Bosch WORCESTER GREENSTAR 37CDi - Plumbing Manifold

Bosch WORCESTER GREENSTAR 37CDi
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CH
Flow
(alternative
from above
appliance)
22
mm
CH
flow
22
mm
c;J!:_
DHW
Out (alternative from above appliance)
15
mm
l U Gas Supply (alternative from above appliance) 22
mm
:~
c..~
~-
1
I
I
I
I
I
I
H
c:;J!:_
Mains Water
In
(alternative from above appliance)
15
mm
CH
Return (alternative from above appliance) 22
mm
DHW
Out
15
mm
Mains Gas Supply 22
mm
CH
return 22
mm
Mains Water
In
15
mm
~ORCESTER
Bosch
Group
INSTALLATION
&
SERVICING
INSTRUCTIONS
FOR
WORCESTER
BOSCH
GREENSTAR
25CDV30CDV37CDci42CDI
6
720
613
700a
(2006/11)
PLUMBING MANIFOLD
CONNECTIONS:
Heating System: 22
mm
compression fittings
DHW:
15
mm
compression fittings
Gas: 22
mm
compression fittings
Use the
fittings
supplied
in
the Hardware
pack.
PREPLUMBING
With
the
plumbing
manifold
installed,
pipework can be installed to the valves
on
the
manifold.
The
system can be filled (without the boiler
being
connected)
using the
charging
link
assembly
(see page 23).
The
valves can be closed enabling the
DHW
and
CH
systems to be tested.
The
boiler can
be
installed
at
later date.
RUNNING PIPES
BEHIND
THE BOILER
If
the boiler pipes are to be
run
behind the
appliance ensure that the pipes pass close to
the
wall
as
shown
in
the diagram opposite,
and within the pipe guide.
PLUMBING MANIFOLD

Related product manuals