EasyManua.ls Logo

Bosch WORCESTER GREENSTAR 37CDi - INSTALLATION

Bosch WORCESTER GREENSTAR 37CDi
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IMPORTANT: All the previous Pre-Installation sections must be read
and requirements
met
before starting boiler or flue installation.
G
~ORCESTER
Bosch
Group
11
D
B
CJ
I
0
t
H
~A
6 720
611
927-17.1
0
INSTALLATION
&
SERVICING
INSTRUCTIONS
FOR
WORCESTER
BOSCH
GREENSTAR
25CDV30CDV37CDci42CD•
6
720
613
700a
(2006/11)
UNPACKING WALL FRAME
AND
ANCILLARY ITEMS
LIFTING
AND
CARRYING PRECAUTIONS:
Lift only a manageable weight, or ask for
help.
When
lifting the boiler, bend the knees,
and keep the
back
straight and feet apart.
Do
not
lift and
twist
at the same time.
Lift and carry the boiler close
to
the body.
Wear
protective clothing and gloves
to
protect from any sharp edges.
A-
Carton
B -
Wall mounting plate
C - Hanging bracket
D -
Pre-plumbing manifold
E - Hardware
pack
F-
Charging Link Assembly
G - Literature
pack
H -
Bottom
panel
I - Trap I Syphon Outlet Connection
(22 mm
Plastic Pipe)
J - Upper
support
(polystyrene)
IMPORTANT
HANDLING
INSTRUCTIONS
It is advised that
two
people are used
to
carry the carton from the van
to
the point
of
delivery.
Once
the carton has been delivered, the
top
of
the carton is opened. If a sharp imple-
ment is used make sure the carton is not
pierced and that the
implement is used
in
such a way so that it may not cause person-
al
injury. All sharp
objects
must be covered
or the
blade retracted after use and put
away
in
a safe place.
~
1.
The
upper
support
is
now
removed with
the
components (bottom panel, pre-plumb-
ing manifold, fixings, documentation set,
charging
link, hanging bracket).
~
2.
The boiler wall mounting plate can
now
be pulled out.
Additional requirements for roof space installa-
tion:
The boiler should be first unpacked before
ascending ladder
to
loft space.
Two sets
of
steps should be used.
Two people should share the lifting
of
the
boiler
up
to the loft hatch, where the boiler
is entered into the loft space tilted and slid
on its
back
into the loft.
Once
the appliance is removed from its pack-
aging
check
the
contents
against the packing
list.
Before
installing
appliance
ensure
system
has
been
cleaned
as
explained
on
page
9.
UNPACKING WALL FRAME AND
ANCILLARY ITEMS

Related product manuals