INSTALLATION
6 720 815 724 (2015/11) 27
Fig. 39 Plume distance to opening
4.6 Condensate connection
Never terminate or discharge into any open source, including; sink,
bath, shower, bidet, toilet etc.
Ensure that the condensate drain is 22mm diameter plastic pipe. It
must fall at least 52mm per metre towards the outlet
Refer to figure 40, condensate connection:
Align the installation side plastic pipework through the pre-plumbing
manifold.
Connect the installation side plastic pipework to the end of the
condensate hose.
Push the plastic pipework inside the condensate hose at least
25mm.
Fig. 40 Condensate connection
1 Opening in building
2 Flue discharge
3 Plume deflector
4 Minimum 1500mm from an opening in the building
Table 27 Key to figure 39
6720643895-119.1Wo
1
3
4
2
Any external condensate pipe work of excessive runs
should be protected with weather resistant insulation to
help prevent freezing.
6 720 815 724-10.1O