EasyManua.ls Logo

Bosch Worcester Greenstar CDi Classic System ErP Series - Page 39

Bosch Worcester Greenstar CDi Classic System ErP Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SERVICING AND SPARES
6 720 815 724 (2015/11) 39
Fig. 61 Control panel
Press and HOLD performance test button (J) for 10 seconds and set
Central Heating temperature to maximum.
The performance test button will illuminate continually.
The boiler will stay in this mode for 15 minutes unless the central
performance test button is pressed again.
Pull the cover off and connect a manometer to the fan pressure test
point.
After measurement replace test point cover.
Fig. 62 Fan pressure readings
Pressures readings in the black area will indicate that the heat
exchanger requires attention/cleaning.
There is a special accessory kit available specifically designed for
cleaning the heat exchanger.
Part number 7 719 001 996.
Fig. 63 Fan pressure test point
1
2
3
4
5
6
max
2
3
1
04
bar
1
reset
eco
1
2
3
4
e
6
maxmin
A
J
B
K
C
L
D
M
E
F
G
H
I
6720647361-23.2Wo
6 720 812 175-39.1O
FAN PRESSURE TEST
Clean the Heat Ex.
Heat Ex. ok
NG Boilers
0
-6
-5
-4
-3
-2-1
-8
-7
mbar
30 CDi:
35 CDi:
- 3.9
- 5.3
LPG Boilers
0
-6
-5
-4
-3
-2-1
-8
-7
mbar
30 CDi:
35 CDi:
- 3.9
- 5.3
NOTICE: Air/Gas ratio
After servicing the CO/CO
2
must be checked using
the procedure in the section “Setting the air/gas
ratio” on page 41.
The setting of the air/gas ratio must be carried out by
a competent person.
Setting the air/gas ratio must not be attempted
unless the person carrying out the conversion is
equipped with a combustion analyser conforming to
BS 7927 and is competent in its use.
6 720 815 724-22.1O

Table of Contents

Related product manuals