EasyManua.ls Logo

Bosch Worcester Greenstar CDi Classic System ErP Series - Page 50

Bosch Worcester Greenstar CDi Classic System ErP Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SERVICING AND SPARES
6 720 815 724 (2015/11)50
27. ch pressure relief valve
Remove the Hydraulic block from the boiler
(26. Hydraulic block).
1. Remove the spring clip from the Pressure relief valve housing.
2. Withdraw the pressure release valve (A) from its housing.
To refit, follow the above in reverse.
Ensure any seals that have been disturbed are renewed.
Fig. 96
2.
1.
A
6 720 812 175-25.1O

Table of Contents

Related product manuals