Do you have a question about the Braun L919 and is the answer not in the manual?
Brand | Braun |
---|---|
Model | L919 |
Category | Lifting Systems |
Language | English |
Details updates for lift installation procedures and Series A6 technical information.
Information on the two ground cables provided with each lift and their installation.
Details on the compact Circuit Sentry Kit for 12-volt lift models.
Technical information for Series A6 lifts, including solenoid and side plate modifications.
Lists current part numbers for various installation components and corrections.
Lists additional parts supplied for installation not found in the main list.
Detailed instructions for routing and securing power and ground cables.
Instructions for installing the Circuit Sentry and connecting power.
Steps for mounting the circuit breaker to its bracket.
Procedure for connecting the circuit breaker's cables.
Illustrations showing exploded views of lift components for identification.
Details on the modification made to the platform's right side plate.
Overview of the L915 Millennium Series lifts and their models.
Definitions and descriptions of key lift components.
Important safety information regarding potentially hazardous situations.
Detailed safety precautions to follow during installation procedures.
Details on installation prerequisites, minimum clear door openings, and obstructions.
Notes for van applications, stepwell, and rear door installations.
Importance and procedure for proper lift grounding.
Ensuring the lift is parallel with door jambs and perpendicular to floor.
Checking for minimum clearances around the lift during operation.
Specific considerations for installing the lift in a stepwell.
Notes for installations involving rear doors or extensive floor-to-ground.
Instructions for securing the lift's base plate through the vehicle floor.
Details on installing reinforcement brackets for subfloor support.
Procedure for drilling and installing the floor grommet.
Instructions for routing and securing the external ground cable.
Instructions for connecting the power cable to the lift and battery.
Steps for installing the Circuit Sentry and connecting its lead wires.
Procedure for connecting the control box harness to the pump module.
Procedure for disconnecting the control box harness.
Instructions for mounting the control box to the vehicle door.
A checklist to verify correct lift positioning and clearance.
Ensuring proper alignment of lift components during testing.
Adjusting platform angle and bridge plate floor level positioning.
Applying decals, reinstalling seats, and storing the owner's manual.
Procedure for properly adjusting the roll stop cylinder rod.
Adjustments for vertical deflection, bumpers, and stop bolts to prevent rattles.
First maintenance interval for lubrication and inspection.
Second maintenance interval for inspection and lubrication.
Major maintenance interval for thorough inspection and lubrication.
Explanation of how the lift operates, including unfold and lower functions.
Description of power source, ground, pump motor, relay, and circuit sentry.
Details on unfold/down, up/fold, and bridging microswitches and their sequences.
Description of the hydraulic pump, fluid, and valve systems.
Troubleshooting for no power, platform unfold, down, up, and fold issues.
Troubleshooting for bridging, roll stop latch, manual pump, handrails, and latches.
Steps for connecting the remote interlock switch.
Specifications for interlock switch wiring and distance.
Instructions for cleaning surfaces and applying decals correctly.
Details on decals not affixed directly to the lift mechanism.
Illustrations and descriptions of decals affixed to the lift.
Information on antiskid application and available sizes/colors.
Data on lift cycle times for various operations and conditions.
Conditions under which lift performance tests were conducted.
Provides dimensions for Fixed and Automatic Inboard Roll Stop models.
Process for handling warranty claims and returns.
Daily checks to perform before operating the lift.
Checks to perform after completing daily lift service.
Final verification of lift alignment and clearances.
Checklist to confirm all installation steps have been completed.