Site Manual
Alarm 2000 Iss 5
46
7 COMMISSIONING TEST REPORT - Alarm 2000
Installed at
Name of premises: ………………………………………………………………
Site reference (if applicable) ……………………………………………………
Address: …………………………………………………………………………...
The system being commissioned is:
New system.
Alteration to an existing system.
Modification to an existing system
Date of Commissioning tests: …………………………………
The purpose of this commissioning test report is to verify the system design and
performance at the time of system handover. The commissioning is to be carried out in
conjunction with the operators manual, installer’s statement and ‘as installed’ drawings.
Should any defects be found, such defects are to be recorded on the commissioning report
of the day, shall be rectified prior to the completion of commissioning, with a supplementary
report being completed on final commissioning.
Commissioning Company: ……………………………………………………………..
Address: ………………………………………………………………………………….
Commissioning Person: ………………………………………………………………...
Signature: ………………………………………………………………………………...
NOTE: It is recommended that the commissioning person read the test report in full
and be conversant with its requirements prior to commencing the commissioning
tests.