3. Operation
User Manual Shutting the P-102 Down For Maintenance
Shutting the P-102 Down For Maintenance
Shutting the P-102 Down for Maintenance.
1. Be sure the P-102 is turned off. Be sure the power light to the P-102 turns off.
2. Remove the power plug from the facilities power source.
WARNING
Electrical Hazard
Electrical contact could cause death or serious injury.
Always perform Lockout/Tagout according to the facility’s policy
before working on the P-102.
3. Perform the Lockout/Tagout procedure according to the procedure at your facility.
NOTE: This procedure only shuts down power to the P-102. Any user equipment remains powered up.
Accelerating Innovation 3-24