EasyManua.ls Logo

Buchi Rotavapor R-100 - Installation; Site Requirements and Mounting

Buchi Rotavapor R-100
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BÜCHI Labortechnik AG Installation | 5
Operation Manual Rotavapor® R-100 21/60
5 Installation
5.1 Installation site
The installation site must meet the following requirements:
Firm and level surface
Space requirements: at least 620 mm x 510 mm (W x D)
If distilling under vacuum, there must be fume extraction apparatus available.
Wherever possible, the Rotavapor® R-100 should be set up inside a fume hood. If
that is not possible for reasons of space, it can also be set up outside if the safety
guard (optional accessory) is fitted and the residual vapors are fed into the fume
hood.
5.2 Mounting the rotary drive unit
IMPORTANT
Risk of property damage due to rotary drive unit falling off
u Make sure that the screw for fixing the rotary drive unit engages securely in the
groove in the tower mount.
u Slide rotary drive unit (2) onto the tower mount (1).
u Tighten screw (4) to lock the rotary drive unit in the groove (3) so that it cannot be
pulled off.
u Tighten the locking lever (5) for the immersion angle.
u Check that the rotary drive unit cannot be pulled off or twisted.

Table of Contents

Related product manuals