EasyManua.ls Logo

Buchi V-700 - System Setup: Dual Rotavapor Configuration

Buchi V-700
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Putting into operation
33
V-700/710 Operation Manual, Version E
5.8 System pump with two controllers on two Rotavapor
Fig. 5.8: Complete system connection with two Rotavapors
Legend:
1: Valve unit
Connections:
Thick line: Vacuum connections
Dotted line: Electrical connection vacuum controller (AS/SB) / vacuum controller (AS/SB) vacuum
pump (switch box) with cable 38010
Thin line: Electrical connection valve unit / vacuum controller (VALVE)

Table of Contents

Related product manuals