EasyManua.ls Logo

Bunn DUAL SH DBC

Bunn DUAL SH DBC
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 43
TROUBLESHOOTING (cont.)
Troubleshooting ProceduresPossible Cause
Screen Displayed
TO CANCEL
PRESS ON/OFF
TO FINISH:
PRESS BREW
BREW STOPPED!
SERVER REMOVED?
1. Soft Heat Server was moved out
of position after the brew cycle was
started.
1. ON/OFF switch was pressed after
the brew cycle was started.
1. Tank Heater failure
2. Triac Failure
3. Control Board/Thermistor failure
To resume brewing, correctly
position the Soft Heat Server and
press BREW again. The brew cycle
resumes from the point it was inter-
rupted.
OR
Press ON/OFF to terminate the brew
cycle.
TO CANCEL
PRESS ON/OFF
TO FINISH:
PRESS BREW
BREW STOPPED!
IS SWITCH OFF?
To resume brewing, press BREW
again. The brew cycle resumes form
the point it was interrupted.
OR
Press ON/OFF to terminate the brew
cycle.
Service Required
Service Required
Service Required
CHECK HEATING
CIRCUIT
HEATING TIME
TOO LONG
29877.2 121504

Other manuals for Bunn DUAL SH DBC

Related product manuals